Navigating the Gateways
Across the event discussions, delay through Gateway 2 presented as a consistent challenge, often driven by poorly coordinated submissions. It was recognised that early collaboration before design is key in preventing rework and delays.
Pre-Construction Service Agreements (PCSAs) support this by enabling early surveys, managing risk, and strengthening collaboration ahead of contract award, helping to build a robust Golden Thread and a high-quality submission.
While the regulatory system is still evolving, there have been strides to improve progression through Gateway 2, with increased BSR resourcing helping to reduce bottlenecks. As projects enter Gateway 3, concerns were voiced around potential repeat of the delays experienced in Gateway 2.
“We haven’t seen much of Gateway 3 yet, but controlled evidence gathering is key. The more you can do to put yourself in the position now, the more secure you are moving forward.”
Early engagement with the regulator, backed by rigorous design and a clear evidence trail, helps clients move through Gateway 2 with confidence.
“Working through the realities of the Act day-to-day, we know early collaboration with engineers, designers and the regulator is essential. Pushing risk down the supply chain or treating the Golden Thread lightly creates problems that show up later.
Partnering with Perega on this event reflects our shared commitment to getting the detail right and supporting clients through every Gateway.”